Industry

Arcelor Mittal

Consulting and research 07/11/2021 Ile-de-France #ITHERM Conseil
Technical and economic feasibility study of works to optimize residual heat recovery on ARCELOR MITTAL's galvanizing units in Florange (57).
Share

TYPE of assignment

Technical and economic feasibility study of works to optimize residual heat recovery on ARCELOR MITTAL’s galvanizing units in Florange (57).

Leader project

About the subsidiary involved in the project

A few figures

2021

Project launch date

Description of the work

Adaptation of the site’s high-temperature water loop (110/140°) to optimize the recovery of existing heat on two lines (heat treatment and galvanizing lines), for heat recovery of a galvanizing line recently brought into service and to supply a future tin-plating line.

Results

  • Adaptation of the high-temperature water loop diagram
  • Technical improvements of the process

More references !