Technical and economic study for connecting the teaching hospital of Clermont-Ferrand to a municipal heating network according to different connection scenarios, aimed at replacing the hospital’s internal heating network supplied by a central boiler house generating saturated steam with a declared power of 18 MW.
Project leader
About the subsidiary involved in the project
A few figures
€600,000 to
€1,250,000
Cost of the work according to scenario
2020
Year of the assignment
Description of the work
Renovation of the hospital’s internal heating network and substations, which will be supplied by a future main 1.5 MW substation provided by the municipal heating network or the existing boiler house, and from which several secondary substations will be supplied while at the same time maintaining continuity of service in the critical hospital environment.
Six scenarios proposed, breaking down into 2 scenarios for connecting secondary substations with constant steam for process purposes for some of them and switched to low-pressure hot water for others. To that end, several solutions have been proposed, more particularly regarding the re-use of the existing network wherever possible, renovation of all or part of the existing underground or overhead network in a service gallery.
More references !