Project design, construction supervision and engineering 04/02/2022 Saint-Gingolph #SF2E-CIE
Feasibility study then complete project management and site supervision and coordination, marketing and financial engineering in a consortium. Awarding the operating contract, monitoring performance and assistance to the operating client over the lifetime of the facility.

Type of assignment

Feasibility study then complete project management including EXE1, fine-tuning, site supervision and coordination, marketing and financial engineering in a consortium on behalf of the municipality of Saint-Gingolph (74500), in partnership with engineering firm SGI, specialists in lakeside engineering work. Awarding the P1-P2-P3 operating contract. Monitoring performance and assistance to the operating client over the lifetime of the facility.

Project leader

About the subsidiary involved in the project

A few figures

2019/2022

Duration of the project

20

substations

900-metre

network

€1,810,000

Total cost of the work

Services provided

Installing a heat pump power plant connected to Lake Geneva (450 kW) coupled with a 580 kW domestic fuel oil boiler for an output of 1,400 MWhu to 20 substations through a 900-metre long high-performance very low temperature network.

 

Very low temperature substation with 3 exchangers:

  • Serial/parallel exchangers between domestic hot water and heating
  • Domestic hot water preheating exchanger
  • Domestic hot water in semi-accumulation to reduce power demand peaks