BNP PARIBAS Real Estate
Type of assignment
Prime contractor for the HVAC work:
- Renovating HVAC facilities on the first floor
- Replacing the refrigerating unit with a heat pump
- Connecting the garden floor and the ground floor to the collective hot and chilled water production facility
- Installing a centralized technical management/building management system for the ground floors/garden floors, first, second and fourth floors
Project Leader
About the subsidiary involved in the project
A few figures
March/August
2021
Duration of the project
€518,000
Total cost of the work
Description of the work
Renovating HVAC facilities on the first floor:
- Installing “2 tubes – 2 wires/ChangeOver” ceiling fan convectors fitted with smart controllers,
- Connection to the collective iced water supply system,
- Installing 2 dual flow energy recovery air handling units for ventilating the premises
Replacing the refrigerating unit with a heat pump:
- Refrigerating unit replaced with a heat pump that can produce iced water in the summer and hot water in the winter to supply the batteries of the fan convectors and cassettes,
- Connecting to the centralized technical management system.
Connecting the garden floor and the ground floor to the collective hot and iced water production facility:
Creating a new piping system from the hot/iced water system on the roof to supply the cassettes of some of the offices on the ground floor and garden floor.
Installing a centralized technical management system for the ground floors/garden floors, first, second and fourth floors:
- Replacing the controllers with smart PLCs in the offices on the ground, garden, second and fourth floors,
- Installing a centralized technical management/building management system controlling the HVAC.