Type of assignment
Complete prime contractor for a biomass boiler house, heating network and substations, including fine-tuning and site supervision and coordination as the agent of a consortium with design office SAFEGE for the heating network part, IGETEC for the structural studies and ESTIVAL Architecture on behalf of ENGIE Solutions under a public service delegation in the municipality of Aurillac (15000).
Project leader
About the subsidiary involved in the project
A few figures !
40 000
40,000 MWhu output
23
km network
80
Substations
2017/2021
Duration of the project
€22,000,000
Total cost of the work
Description of the work
Installation of a boiler house comprising a biomass storage silo, with a motor-driven grapple loaded feeding two biomass boilers (6.5 MW and 3.5 MW) and two gas boilers (11MW top-up and backup each) for an output of 40,000 MWhu in 180 substations through 23 km of pre-insulated network steel.
Studies for the conversion of the 180 boiler rooms in substations, including the production of existing/planned 3D plans.
Special studies concerning the connection of sensitive buildings such as hospitals or industrial sites.